HEAD OF DEPARTMENT: Professor Dragoslav Slović, PhD, dragoslav.slovic@fon.bg.ac.rs
DEPARTMENT SECRETARY: Dragana Stojanović, PhD, dragana.stojanovic@fon.bg.ac.rs
Members:
Barbara Simeunović, PhD, barbara.simeunovic@fon.bg.ac.rs
Ivan Tomašević, PhD, ivan.tomasevic@fon.bg.ac.rs
Ivona Jovanović, BSc, ivona.jovanovic@fon.bg.ac.rs
The Department of Industrial and Management Engineering also encompasses:
- Center for Process Engineering
Manager: Barbara Simeunović, PhD
- Laboratory for Work Study
Manager: Dragana Stojanović, PhD - Lean center
Manager: Professor Dragoslav Slović, PhD
Education
- Undregraduate studies
- Production systems
- Fundamentals of industrial engineering
- Process engineering
- Facility location and layout
- Continuous production improvement
- Production systems design
- Performance measurement and evaluation
- Master studies
- Process management
- Lean manufacturing
- Performance and compensation management
- Management Engineering
- Location and facility layout design
- PhD studies
- Business process management
- Lean process improvement
- Work performance and compensation management
Consulting
Professional training
- Lean approach to process improvement
- Gemba kaizen approach to process improvement
- Business Process Management
- Process identification and mapping
- POKA-YOKE – system for error prevention
- Work and time measurement
- Job description and evaluation
- Wage system improvement through wage incentives system design
Projects – references
Project title |
Client(s) |
Implementation period |
Production process improvement in company BUCK Lighting | BUCK Lighting, Belgrade, Serbia | February 2018 – April 2018 |
Equipment layout design in company Popović Company d.o.o. | Popović Company d.o.o., Bački Jarak, Serbia | February 2017 – May 2017 |
Capacity Building for Planning and Designing Work/Business Processes for Human Resource Management Functions and Organizational Units in the New Sector for Human Resources Management of the Serbian Ministry of Interior – UB Project – No.2400630 | Organization for Security and Co-operation in Europe, Ministry of Interior, Republic of Serbia | November 2015 – December 2015 |
SERBIA Wage bill management project – P151243 | World Bank & Ministry of Public Administration and Local Self-Government | March 2015 – July 2015 |
Design of organizational and process structure model and creation of organizational and job systematization policy in Jat Tehnika | Jat Tehnika, Belgrade, Serbia | September 2014 – December 2016 |
Employee structure analysis in public enterprises in city of Belgrad, work evaluation analysis and wages analysis, identification of opportunities for wage calculation improvements | City of Belgrade, Serbia | September 2014 – October 2014 |
Business process optimization in public enterprise Elektromreža Srbije | PE Elektromreža Srbije, Serbia | April 2014 – September 2014 |
Process optimization, production cost cutting, and financial performance improvement in Sojaprotein AD | Sojaprotein – Victoria Group, Bečej, Serbia | November 2013 – January 2014 |
Improving organization of public enterprises in municipality of Obrenovac by wage system standardization | Municipality of Obrenovac, Serbia | October 2012 – September 2013 |
Improving the organization of public sector enterprises of the city of Belgrade by applying standardization of organization elements and support functions to the core activity | City of Belgrade, Serbia | 2012 |
511084-TEMPUS-1-2010-1-RS-TEMPUS-JPHES – LeanEA – Production and Profitability improvement in Serbia Enterprises by adopting Lean Thinking Philosophy and strengthening Enterprise – Academia connections | University of Belgrade, University of Novi Sad, University of Kragujevac, partner companies that participated on project (FAD, Metalac a.d., Tarkett, JTI, Unimet) | 2011 – 2013 |
Organizational structure improvement and job systematization in public enterprise JKP Gradska toplana Valjevo | JKP Gradska toplana Valjevo, Valjevo, Serbia | 2011 |
Organizational structure design and job systematization in public enterprise JKP Gradske pijace Beograd | JKP Gradske pijace, Belgrade, Serbia | 2011 |
Organizational structure design and design of unique wage system in HIP Petrohemija Pančevo | HIP Petrohemija Pančevo, Pančevo, Serbia | 2010 |
Tempus project: Conversion Courses for Unemployed University Graduates in Serbia – ConCur – 145009 – TEMPUS – 2009 – RS – JPHES | University of Belgrade, Serbia | 2009-2012 |
Organizational analysis of public and public utilities enterprises in Belgrade | City of Belgrade, Serbia | 2009 |
Wage System and Organization Improvement at Hypo Alpe- Adria- Bank a.d | Hypo Alpe- Adria- Bank a.d, Belgrade, Serbia | 2009 |
Wage System Improvement at Hypo Alpe- Adria- Leasing d.o.o. | Hypo Alpe- Adria- Leasing d.o.o., Belgrade, Serbia | 2009 |
Process control in Aerospace industry, teaching, controlling and verifying working procedures of the Six sigma | Orao a.d. Bijeljina, Bosnia and Herzegovina | 2009 |
Application of International Standard Series ISO 9001:2008 | University of Belgrade, Faculty of Organizational Sciences (internal project), Serbia | 2008-2010 |
PRISMA – Program for Resettlement In Serbia and Montenegro Army | Ministry of Defense, Serbia and Montenegro | 2008 |
Increase in Competitiveness of Enterprises for Vocational Rehabilitation and Employment of the Persons with Disability on the Commercial Market of Serbia | Ministry of Labour and Social Policy of Republic of Serbia | 2008 |
Production efficiency increasing in company Fabrika automobilskih delova FAD A.D. by application of wage incentives and lean manufacturing principles | Fabrika automobilskih delova FAD, Gornji Milanovac, Serbia | 2008 |
Strategic development of Luka Beograd company management and development of company corporative brand identity | Luka Beograd, Belgrade, Serbia | 2008 |
Improvement of jeans apparel sewing process in company Zet Innovation – Novi Pazar | Zet Innovation, Novi Pazar, Serbia | 2006 |
Improvement of jeans apparel sewing process in company Max Menus – Novi Pazar | Max Menus, Novi Pazar, Serbia | 2006 |
Improvement of kids apparel sewing process in company Stig – Novi Pazar | Stig, Novi Pazar, Serbia | 2005 |
Organizational structure improvement and job systematization in JKP Gradska toplana Kruševac | PE Gradska toplana Kruševac, Kruševac, Serbia | 2005 |
Microorganisation improvement of Telekom Srbija AD | Telekom Srbija AD, Belgrade, Serbia | 2005 |
Job description and Evaluation and Wage System in PUPIN DKTS – Beograd | Pupin Telekom DKTS, Belgrade, Serbia | 2003 |
Technology Project MNTR 0230 Management of Business System Quality. Research in management of Business System Quality | Ministry of science and technological development of Republic Serbia | 2002-2004 |
Job description and evaluation in JP EPS – Elekrodistribucija Beograd | PE EPS – Elekrodistribucija Belgrade, Belgrade, Serbia | 2002 |
Application of KAIZEN approach in work process arrangement | Orthopedic company ˝RUDO˝, Belgrade, Serbia | 2002-2003 |
Business analysis through analytical method for profitability improvement in company “Rudo” | Orthopedic company ˝RUDO˝, Belgrade, Serbia | 2002 |
Work process arrangement in the department Ortotika for the wheelchair | Orthopedic company ˝RUDO˝, Belgrade, Serbia | 2002 |
Study of production improvement by The New Wage Incentive System in Sloga – Guča | Sloga – Guča, Guča, Serbia | 2002 |
Study of technological production improvement in Javor – Ivanjica | Javor – Ivanjica, Ivanjica, Serbia | 2002 |
Wage Incentives and Production Efficiency Improvement | Javor – Ivanjica, Ivanjica, Serbia | 2002 |
Strategic Project of Technology Development Transfer and Diffusion of Knowledge and Technologies | Ministry of science of Republic Serbia | 1998 |
Design, Implementing and Testing of Quality System According to Standard YUS ISO 9004-2 Requirements at FON | University of Belgrade, Faculty of Organizational Sciences | 1997 |